Scope: Manufacturing, supply and installation of the DHC Districlima substation control and energy exchange package consisting of 2 cold exchangers (499.1kW) and 2 heat exchangers (192kW).

Location: Barcelona

Engineering: ELETRESJOTA

Client: EDAIE